Search results
Filter by
ESO content (270)
Codes
The SQSS review panel is made up of a panel chair and a panel technical secretary (provided by us), as well as members of the National Grid System Operator, transmission owners, offshore…
Charging
TNUoS charges recover the cost of installing and maintaining the transmission system in England, Wales, Scotland and Offshore.Who does this charge apply to?✓ Generators✓ Suppliers✓ …
Codes
The Frequency Risk and Control Report includes an assessment of the magnitude, duration and likelihood of transient frequency deviations, forecast impact and the cost of securing the system and…
Codes
The Security and Quality of Supply Standard sets out the criteria and methodology for planning and operating the National Electricity Transmission System (NETS).As the code administrator for the…
Document
:
Codes
SQSS Panel Headline Report 11 September 2024
Strategic Energy Planning
The electricity system is in a period of transition. We are quickly moving away from energy predominately being supplied by large-scale transmission connected generation, to a larger volume of…
Document
:
Charging
July Forecast TNUoS Tariffs for 2025-26 - Report