Search results
Filter by
ESO content (79)
Strategic Energy Planning
The ETYS is the ESO’s view of how the future transmission system requirements will be met. Currently, this focuses mainly on bulk power transfer requirements, particularly during winter-peak…
Strategic Energy Planning
The region includes the high demand area of London, generation around the Thames estuary, and the long set of circuits that run around the south coast and South Wales.Interconnection to central…
Document
:
Strategic Energy Planning
The ETYS outlines our view of the National Electricity Transmission System over the next ten to twenty years.
Strategic Energy Planning
The Electricity Ten Year Statement (ETYS) is the ESO’s view of future transmission requirements and the capability of Great Britain’s National Electricity Transmission System (NETS) over the next…
Strategic Energy Planning
The Western transmission region includes boundaries in the Midlands and the north of Wales. This includes the lower Midlands boundary B9 and the north Wales boundaries NW1, NW2 and NW3.The map below…