Power control device along Blyth to Tynemouth and Blyth to South Shields
Type: Control power flow
Status: Strategic Optioneering
Boundaries: B7aI
Region: North England
Install a power control device along the Blyth to Tynemouth and Blyth to South Shields 275 kV overhead line route. This would improve the capability to control the power flows from north to south of the transmission network.

(Previously recommended in Network Options Assessment 2021/22 Refresh)
NOA 2021/22 Refresh Recommendation:
Proceed - Critical
NHNC
New circuit from north east Scotland to the Central Belt
Type: Develop new circuits
Status: Scoping
Boundaries: B1a; B2; B4; B5;
Region: Scotland
New circuit from north east Scotland to the Central Belt

Leading The Way: 2038

System Transformation: 2038
NOA 2021/22 Refresh Recommendation:
Proceed - Critical
NNNC
New circuit between New Deer and Greens (New Deer 2)
Type: Develop new circuits
Status: Planning/consenting
Boundaries:
Region: Scotland
This project is currently required to enable the development of a robust and reliable offshore network connection and will be reappraised in the detailed design stage
NOA 2021/22 Refresh Recommendation:
Enabling works
NOR4
Reconductor a short span of the Norton-Osbaldwick 2 400kV circuit
Type: Upgrade existing circuits
Status: Strategic Optioneering
Boundaries: B7aI
Region: North England
Replace some of the conductors in Norton to Osbaldwick 2 circuit with higher-rated conductors to increase the circuit’s thermal rating.

(Previously recommended in Network Options Assessment 2021/22 Refresh)
NOA 2021/22 Refresh Recommendation:
HND essential option
NOR5
Reconductor a short span of the Norton-Osbaldwick 1 400kV circuit
Type: Upgrade existing circuits
Status: Strategic Optioneering
Boundaries: B7aE; B7aI
Region: North England
Replace some of the conductors in Norton to Osbaldwick 1 circuit with an even higher-rated conductor to increase the circuit’s thermal rating.

(Previously recommended in Network Options Assessment 2021/22 Refresh)
NOA 2021/22 Refresh Recommendation:
HND essential option
NOR6
Replace the conductors on the existing circuit between Norton and Osbaldwick with higher capacity conductors
Type: Upgrade existing circuits
Status: Scoping
Boundaries: B7aE; B7aF; B7aI;
Region: North England
NOA 2021/22 Refresh Recommendation:
Proceed - Critical
NTP1
Power control device north of Tilbury 400 kV
Type: Upgrade existing circuits
Status: Strategic Optioneering
Boundaries: LE1; SC1Rev; SC3Rev
Region: South Wales and South England
Install a power control device along the North Tilbury 400 kV overhead line route. This would improve the capability to control the power flows east of the transmission network.
NOA 2021/22 Refresh Recommendation:
Proceed - Critical
OPN2
A new 400 kV double circuit between the existing Norton to Osbaldwick circuit and Poppleton and relevant 275 kV upgrades
Type: Develop new circuits
Status: Planning/consenting
Boundaries: B7aE; B7aI; B8
Region:
Construct a new 400 kV double circuit in Yorkshire to facilitate power transfer requirements across the relevant boundaries. This new circuit connects near Poppleton and tee-in to the existing Norton to Osbaldwick 400 kV circuit. 275 kV upgrades are delivered as part of the scope to increase power transfers. Substation works are also required.
NOA 2021/22 Refresh Recommendation:
HND essential option
OTHW
Carry out thermal upgrading on the existing circuit between Osbaldwick and Thornton
Type: Upgrade existing circuits
Status: Scoping
Boundaries:
Region: North England
This project is currently required to enable the development of a robust and reliable offshore network connection and will be reappraised in the detailed design stage
NOA 2021/22 Refresh Recommendation:
Enabling works
PCR1
Recondutor Carrington - Penwortham & Padiham - Penwortham 400kV circuits
Type: Upgrade existing circuits
Status: Scoping
Boundaries: B6I;
Region: North England
Replace the conductors on the existing circuits between Carrington and Penwortham and Penwortham and Padiham with higher capacity conductors

Leading The Way: 2036

System Transformation: 2036
NOA 2021/22 Refresh Recommendation:
Hold