Search results
Filter by
Datasets (112)
- CSV
- XLSX
Balancing costs
There is a file for each run type we calculate a BSUoS charge for - Interim Initial (II), Settlement Final (SF) and Reconciliation Final (RF). These are updated daily with the actual Half Hourly…,…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Carbon intensity
The carbon intensity of balancing actions measures the difference between the carbon intensity of the combined Final Physical Notice (FPN) of machines in the Balancing Mechanism (BM) and the…
- CSV
Ancillary services
This dataset contains the results from daily auction for static FFR and buy orders. For service requirement see this page: Static FFR Requirements
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- ZIP
- CSV
System
As part of our daily planning processes within the ESO control room, the control room strategy team produces a System Operating Plan (SOP) at key demand peaks or troughs throughout the day, at what…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…