Search results
Filter by
Datasets (112)
- CSV
- PNG
Demand
This dataset contains national electricity demand forecast for 7 days ahead as well as all historic 7 day ahead demand forecasts. The forecast assist the industry to make efficient decisions in…
- CSV
Demand
This dataset contains the historical and forecast profile dates used to convert our Cardinal Point forecasts into half hourly demand forecasts between the start of 2018 up to 14 Days Ahead. The…
- CSV
System
This dataset contains an estimate of the outturn inertia and market provided inertia for Great Britain Transmission System.
- CSV
Ancillary services
The current suite of response services (DC, DM, and DR) are now being procured via the EAC platform. The daily auction results will now be published below. The previous results page will no longer be…
- CSV
- XLSX
Balancing costs
There is a file for each run type we calculate a BSUoS charge for - Interim Initial (II), Settlement Final (SF) and Reconciliation Final (RF). These are updated daily with the actual Half Hourly…,…
- CSV
Carbon intensity
The carbon intensity of balancing actions measures the difference between the carbon intensity of the combined Final Physical Notice (FPN) of machines in the Balancing Mechanism (BM) and the…
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- ZIP
- CSV
System
As part of our daily planning processes within the ESO control room, the control room strategy team produces a System Operating Plan (SOP) at key demand peaks or troughs throughout the day, at what…