Search results
Filter by
Datasets (112)
- CSV
Ancillary services
The Balancing reserve service has been designed to secure firm positive and negative reserve on BM units at the day ahead stage. The service is procured via a daily auction at 08:15 for delivery…,…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Generation
This dataset contains NRAPM (Negative Reserve Active Power Margin) forecast for Daily 2-14 days ahead and Weekly for 2-52 weeks ahead for both National and Scotland. The purpose of the NRAPM forecast…
- CSV
Ancillary services
A set of auction result views which present the outcome of daily Balancing Reserve (BR) auction runs. The EAC-BR Auction Results are updated daily in the morning and are available in the listed…
- CSV
Connection registers
A list of interconnector projects that hold connection contracts with NGESO. These include active interconnectors and future interconnector projects., Note, : The Mega Watt (MW) Total MW Import…
- CSV
Connection registers
A list of connected or contracted to connect embedded generation projects in Scotland.
- CSV
Connection registers
A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly connected to the National…
- ZIP
- CSV
System
As part of our daily planning processes within the ESO control room, the control room strategy team produces a System Operating Plan (SOP) at key demand peaks or troughs throughout the day, at what…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…