Search results
Filter by
Datasets (112)
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead.
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatts (MW) at a daily resolution for 2-14 days ahead.
- CSV
- DOC
Generation
Electricity System Operator (ESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This…
- CSV
Ancillary services
The NG ESO publishes non-BM instruction data from our ASDP system once instructions have been confirmed by Service Providers. This information is then continuously published throughout the day on…
- CSV
Trading
This dataset contains data for historic GTMA (Grid Trade Master Agreement) trades conducted since April 2015. The data includes the trade ID, start and end time and date, the volume in MW, the price…
- TXT
- CSV
Ancillary services
As part of Clean Energy Package (CEP) 6.9, we will be running daily auction for procurement of STOR. The buy curve used in the daily assessment process is available here.
- CSV
Ancillary services
As part of Clean Energy Package (CEP) 6.9 we will be running daily auction for procurement of Short Term Operating Reserve (STOR). The daily results from the auction are available here.
- CSV
Ancillary services
The dataset contains forecasts of our Dynamic Containment Low and High requirements for the next 4-days. The methodology uses forecasted demand, inertia, and response volumes as well as a view of the…
- CSV
Trading
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal…,…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…