Search results
Filter by
Datasets (112)
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
- CSV
Generation
OPMR is the amount of generation exceeding the demand forecast needed to meet our reserve requirement. When assessing and publishing generation availability information against system requirements,…
- CSV
- DOC
Generation
Electricity System Operator (ESO) publishes at a half-hourly resolution the embedded (refer to embedded document for definition) wind and solar forecast from within day up to 14 days ahead. This…
- CSV
Carbon intensity
This dataset contains national carbon intensity forecast for the GB electricity system. The carbon intensity of electricity is a measure of how much CO2 emissions are produced per kilowatt hour of…
- CSV
Generation
The dataset contains national and windfarm-level 0-14 Day Ahead wind forecasts for all the windfarms which provide real-time operational metering (SCADA telemetry) to the ESO. The forecasts are based…
- CSV
Generation
The dataset contains national and anonymised BMU-Level 0-14 day ahead wind forecasts for all the windfarms which are used to produce ESO's national day ahead incentive wind forecasts available…
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead.
- CSV
Generation
This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatts (MW) at a daily resolution for 2-14 days ahead.
- CSV
Trading
National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal…,…
- CSV
Interconnectors
These are the values submitted by NGESO to the interconnector capacity calculation processes which restrict the maximum GB import and export interconnector flows. The values are submitted in MW per…