Search results
Filter by
ESO content (579)
Balancing services
The Enhanced Reactive Power Service (ERPS) is suitable for generators who can provide reactive power over and above the Grid Code and Obligatory Reactive Power Service (ORPS) requirements. On this…
Charging
All users of the electricity transmission system pay to use it. This brief overview looks at who pays, for what, and how the charges are calculated.All users of Great Britain’s electricity network…
Charging
Connection Charges recover the cost of installing and maintaining connection assets which connect individual users to the GB Transmission Network.Who does this charge apply to?✓ Generators✕…
Charging
AAHEDC recovers costs for The North of Scotland which is currently the only area specified to receive assistance.Who does this charge apply to?We recover the assistance amount through a charge on…
Charging
All users of the electricity transmission system pay to use it. This brief overview looks at who pays, for what, and how the charges are calculated.
Charging
Need to talk to us about own-bills, forecast costs or the calculation of the billing methodology? Get in touch with the relevant team
Strategic Energy Planning
The Holistic Network Design (HND) is a first of its kind, integrated approach for connecting 23GW of offshore wind to Great Britain.By considering future offshore generation out to 2030,…
Balancing services
Reactive power services are how we ensure voltage levels on the system remain within a given range, as mandated in the SQSS (Security and Quality of Supply Standard). We instruct generators or other…
Document
:
Charging
BSUoS Fixed Tariff 5 and Draft Tariff 6 - June 2024 v1