GC0151: Grid Code Compliance with Fault Ride Through Requirements
Proposal to change the Grid Code with respect to the process followed by Users, Network Operators and the ESO in the event of a Fault Ride Through occurrence where a User’s site or Network Operator’s asset(s) coincidently trips/de-loads.
Modification status:
Concluded
- GC0151: Grid Code Compliance with Fault Ride Through Requirements
Last updated:
20 March 2024
Code Administrator Contact: [email protected]
Governance Route: Standard Governance
Impacts:
High: Generators, Transmission System Operators, Interconnectors, Transmission Owners, Distribution Owners
Implementation: 08 November 2021